Skip to content
MANUPRIME

Continuous / process

ERP for Cement Manufacturers

Continuous process, silo-wise quality and a strength result that arrives days after the bag has shipped. Quality here is statistical, not pass-fail.

Stages mapped
6
Quality checks
3
Wastage rules
3
Compliance items
3

Your process

The stages, already mapped.

Crushing to packing with silo-wise quality. These are the stages the template ships with — machines and checks included. Yours will differ in detail; that is configuration, not development.

  1. 1

    Crushing

    Crush limestone to raw-mill feed size

    Machines
    Crusher
    Checked
    Feed size analysis
  2. 2

    Raw mill

    Grind and blend raw meal to LSF targets

    Machines
    VRM raw mill
    Checked
    LSF/SM/AM (XRF)
  3. 3

    Kiln

    Pyroprocess to clinker with free-lime control

    Machines
    Rotary kiln 3000 TPD
    Checked
    Free lime, litre weight
  4. 4

    Clinker cooling

    Cool and store clinker

    Machines
    Grate cooler
    Checked
    Cooler efficiency
  5. 5

    Cement mill

    Grind clinker + gypsum/fly ash to fineness

    Machines
    Ball mill + separator
    Checked
    Blaine, residue
  6. 6

    Packing plant

    Rotary packer bagging with weight audit

    Machines
    Packer 120 TPH
    Checked
    Bag weight ±200 g
Production orders in MANUPRIME, running as a cement manufacturing plant
The production screen in the demo, loaded with this trade's own materials and machines.

What goes in

Limestone, gypsum, fly ash

What comes out

OPC / PPC bags & bulk

OPC 43/53 · PPC · Bulk cement

Who is it for

Not all cement manufacturers work the same way.

The template is the same; what it has to answer for is not. Find the one that sounds like you — if none of them do, say so on the call and we will tell you honestly whether this is the right fit.

Integrated cement plants

Clinker and grinding stages costed separately.

Grinding units

Bought clinker, additive ratios and bag-wise dispatch.

RMC and block manufacturers

Mix designs, cube tests and site-wise delivery.

MANUPRIME AI

Ask it about this floor, in your own words.

The AI reads the same records this template creates — so on a cement manufacturer floor the questions it can actually answer are the ones you already ask at the morning meeting.

Questions it answers here

  • “Why has clinker factor moved this week?” — currently 0.68 in the demo data
  • “Why has power kwh/t moved this week?” — currently 72 in the demo data
  • “Why has kiln run factor moved this week?” — currently 92% in the demo data
  • “Where is my wastage going?” — dust (recycled), costed back to the batch that caused it
  • “What am I short of in the next 14 days?” — with the covering purchase order drafted for approval

And what it is not allowed to do

  • It shows its working, or it does not answer

  • It drafts. A person releases

  • It sees only what the person asking can see

How MANUPRIME AI works →

Quality

What quality control looks like here.

Checks that hold a dispatch, at the frequency this trade actually inspects.

Isometric illustration of an inspection station gating a batch
Quality plan for Cement Manufacturing
ParameterMethodFrequency
Free lime (clinker)Lab titrationHourly
Blaine finenessAir permeabilityPer mill hour
Compressive strengthMortar cubes 3/7/28 dPer silo lot

Wastage and recovery

The part generic ERPs get wrong.

Most systems can only write material off. In this trade that is the difference between a costing you believe and one you argue with.

Isometric illustration of material flowing through production stages, with recovered waste returning to stock

Rules that ship with this template

  • Dust from bag filters recycled to process
  • Spillage cement reprocessed
  • Torn bags reconciled at packer

What drives your cost per unit

  • Fuel (coal/AFR) per clinker tonne
  • Power kWh/T cement
  • Clinker factor (PPC blending)

In short:Dust (recycled).

Compliance

What this trade has to prove.

Configured, not bolted on afterwards — the records come out of the same transactions your floor is already entering.

BIS certification per grade with silo tests
CPCB continuous emission monitoring
Weighbridge + e-way on every truck

On the dashboard

The numbers this plant is judged on.

Sample figures from the demo, so you can see the shape of what you would be looking at every morning.

Clinker factor
0.68
Power kWh/T
72
Kiln run factor
92%

Illustrative values from the demo dataset, not a customer's figures.

Questions

Questions we get asked first.

Is quality tracked silo-wise?

Yes. Fineness, setting time and strength are recorded against the silo and the production window, so a dispatched lot resolves to the quality data behind it.

How are 7-day and 28-day strengths handled?

As scheduled inspections that land after dispatch, held against the original production lot, so the record completes without re-opening the transaction.

Can it handle bulk and bag dispatch together?

Yes, with weighbridge capture for bulk and bag counts for packed, both reducing the same silo stock.

See it running with Cement Manufacturing data.

The demo opens with this trade's materials, machines, checks and reports already in place. No signup, nothing to install.